Takanini School Road

Project Type
Urban Development
Region/Location
Takanini/Auckland
Start Date
December 2021
Completion Date
April 2022

Takanini School Road   - Shared pathway upgrade and Intersection upgrade, commissioning new signalised Intersection.

Brownfield site, excavated existing road700 deep, High risk services worked around Transmission gas mains, sub transmission Power cables .

Installed subsoil drainage and other deep drainage, new slipform, Kerb and Channel, excavated pavement to required depth.

Road and Footpath reconstructed with sub base concrete and deep lift asphalt

Reconstructed existing footpath 1.5 to 3.0metre Shared user path with vehicle crossings, installed 4-way signalised controlled intersection.

The thoroughfare is a heavily used arterial route in a built-up area, with a Primary School, Shopping Centre and Commercial Industries nearby. The Upgrade is a safety initiative in which all residents benefit from.

Internal Services included: Traffic Management, Traffic Signals, Civil Crews, TMP Design and Approval.